久久精品国产热_中文字幕日韩精品亚洲七区_色综合天天干_啊灬啊灬啊灬快灬深一区2区,成人国产在线视频,欧美高清一区二区,欧美日韩亚洲第一区

Contact Us

Tiny Cooling Fan programming principles

Date: 2015-5-28   Click: 1476 Times

"Tiny Cooling Fan" use zero-crossing triac trigger, controlled by the microcontroller triac off, by changing each control cycle on and turn-off thyristor communicate complete full-wave signal number to adjust the load power, and thus achieve speed control purposes. Because INT0 signal reflects frequency voltage zero-crossing time, so "Tiny Cooling Fan" as long as the external interrupt 0 interrupt service routine complete control door opening and closing, and the use of the interrupt service frequency counts to control the amount of n and judgment that every interrupted once, to be n minus 1 count, if n is not equal to 0, to maintain control level "1" to continue to open the control door; if n = 0, then the control level is reset to "0", close the control gate, SCR zero trigger pulse is not passed. Control volume requirements such "Tiny Cooling Fan" can be obtained in accordance with the control process, to achieve zero-crossing triac control, so as to achieve the effect by controlling the amount of control to achieve speed is adjustable.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

主站蜘蛛池模板: 门源| 嘉祥县| 湄潭县| 牟定县| 南康市| 游戏| 开江县| 隆安县| 射洪县| 平罗县| 安徽省| 娱乐| 丰台区| 定远县| 鄂伦春自治旗| 中西区| 马龙县| 吉隆县| 同江市| 永嘉县| 西林县| 会泽县| 景东| 万全县| 台安县| 甘谷县| 栾城县| 北辰区| 梧州市| 南部县| 留坝县| 淳安县| 金平| 汉寿县| 叙永县| 宝山区| 梧州市| 双流县| 肃北| 邯郸市| 晋中市|