久久精品国产热_中文字幕日韩精品亚洲七区_色综合天天干_啊灬啊灬啊灬快灬深一区2区,成人国产在线视频,欧美高清一区二区,欧美日韩亚洲第一区

Contact Us

Micro Cooling Fan Precautions

Date: 2015-7-20   Click: 1620 Times

1. The first check bit "Micro Cooling Fan" position of work, and the fan work necessary parameters and fan type, etc.,
2. Jog motor commissioning Check the direction of rotation direction of the fan rotor and fan nameplate are the same, if not, the need to cut off power supply in case of power supply line of any two swap position after re-commissioning.
3. Before use, carefully read this manual and the clear fan of the various requirements and working conditions.
4. Carefully check the electrical system is intact. The wiring is correct, whether the transport connection vibrating loose, virtual access situation.
5. "Micro Cooling Fan" Have motor damp, after turning on, that the motor rotation direction is specified.
6. Test fan operation must be stable, adequate lubrication. Fan bearing housing vibration and temperature to meet the requirements, you can start using.
7. A tool or any other items not on the main bearing housing position, ensure that equipment around tools and other items should be stored in order to maintain good relations and unobstructed.
8. careful observation "Micro Cooling Fan" Installation and preparation work is not done to determine the position, and that if there are any that do not meet the specifications of the installation situation must be resolved promptly, otherwise the fan in use, it is prone to all a wide variety of issues.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

主站蜘蛛池模板: 宜宾市| 岗巴县| 来安县| 渝北区| 吉林省| 纳雍县| 博野县| 伊川县| 财经| 张家港市| 永川市| 深圳市| 都兰县| 正阳县| 江安县| 洱源县| 库尔勒市| 论坛| 唐山市| 集安市| 鹰潭市| 金溪县| 资兴市| 海丰县| 新邵县| 开封市| 社旗县| 仙游县| 抚远县| 和顺县| 丹凤县| 南充市| 麻城市| 九江县| 金溪县| 陇南市| 海丰县| 巨鹿县| 曲麻莱县| 福鼎市| 延庆县|