久久精品国产热_中文字幕日韩精品亚洲七区_色综合天天干_啊灬啊灬啊灬快灬深一区2区,成人国产在线视频,欧美高清一区二区,欧美日韩亚洲第一区

Contact Us

AC Fan after the installation is complete the note

Date: 2016-5-11   Click: 1624 Times

"AC Fan" after installation, flip a hand wheel, check whether tight or grazing to other sites. In the absence of exceptional circumstances, you can test run, the exposed part of the fan drive apparatus should be shielded, which in the "AC Fan" is not the whole package, user supplied, if the air inlet pipe is not connected, then, also need to add a protective cover. The fan is equipped with electronic control box must match the fan phase. In particular, note that, when the fan wiring, be sure to get a professional electrician wiring, the wiring must be correct and reliable, especially at the electrical control box terminal number must be consistent with the fan numbers on the fan after installation to check the entire installation the "AC Fan" living within the impeller is not a tool to pull down or other debris.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

主站蜘蛛池模板: 冀州市| 卢龙县| 泰兴市| 行唐县| 合川市| 卫辉市| 益阳市| 轮台县| 贞丰县| 成安县| 高碑店市| 张家口市| 新巴尔虎左旗| 舒兰市| 马龙县| 潜江市| 徐汇区| 德化县| 闽清县| 济宁市| 金平| 九江市| 临颍县| 博爱县| 柘荣县| 东阿县| 金华市| 依安县| 涞源县| 庄河市| 连山| 岚皋县| 中江县| 双峰县| 含山县| 巴林左旗| 讷河市| 东台市| 吉木乃县| 云龙县| 大同市|